Products
Triplex Liner System
TLS-11600 – Five-ply laminated composite, with a non-porous membrane bonded between four layers of fiberglass, with a total fabric weight of 116-oz. per square yard, saturated with 100% solids epoxy, cured-in-place, and bonded to the existing structure. TLS-11600 is designed for structures over 24’ in depth and in structures with conditions that require the additional structural enhancement.
TLS-6800 – Three-ply laminated composite, with a non-porous membrane bonded between two layers of fiberglass, with a total fabric weight of 68-oz. per square yard, saturated with 100% solids epoxy, cured-in-place, and bonded to the existing structure. TLS-6800 is designed for structures up to 24’ in depth with serious infiltration and/or deterioration.
TLS-5600 - Three-ply laminated composite, with a non-porous membrane bonded between two layers of fiberglass, with a total fabric weight of 56-oz. per square yard, saturated with 100% solids epoxy, cured-in-place, and bonded to the existing structure. TLS-5600 is designed for structures up to 12’ in depth, with moderate infiltration and/or deterioration.
TLS-4400 - Three-ply laminated composite, with a non-porous membrane bonded between two layers of fiberglass, with a total fabric weight of 44-oz. per square yard, saturated with 100% solids epoxy, cured-in-place, and bonded to the existing structure. TLS-4400 is designed for structures up to 8’ in depth, with minor infiltration and/or deterioration, or for preventive maintenance on new structures.
Services
Cured-in-place Fiberglass/PVC Manhole & Lift Station Liners
Chemical Grouting
Manhole Bench & Invert Rebuilds
Manhole Inspection & Reports
Construction Photography and Videography
Testimonials
Ed Russell, Project Manager, City of Loveland, CO
"The City of Loveland would like to take this time to thank your company for the great job they did lining our lift station at Boyd Lake a few weeks ago with the Cured-in-Place liner system. As you know, we considered many options before becoming aware of the Cured-in-Place system which ended up being the only feasible and economical solution to our problem.
The undertaking of this difficult project by your company showed the determination and experience that your firm obviously puts in place to complete even the hardest of jobs and certainly demands the highest recognition for completion of a project like this."
Laurin Lowry, City of Hamilton, MT
"We used a Cured-in-Place liner in a wet well deemed unfeasible for renovation by most professional engineers, which resulted in eliminating a 100,000 gallons per day infiltration problem that had plagued our city of many years".
Ernie Schlagel, Town of Thermopolis, WY
"We experienced a sewer line collapse - had the Cured-in-Place liner not been installed in the manhole closest to the treatment plant, the entire manhole would have collapsed. This saved the town a major environmental disaster."
14 - 14
<
>
BEFORE
AFTER
Pump Station Rehab Team Arrives
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Pump Station Before
Before the heat
Pump Station After Completion
4 - 16
<
>
Products
Services
Testimonials
Manhole Rehab
Culvert Rehab
Pump Station Rehab